Meadow Park Dam

Location: Crossville, TN
Owner: City of Crossville
General Contractor: Brayman Construction Corp.
Value: $4,277,465
Date Complete: July 2012

Structural remediation to provide stability and to eliminate leakage through and under dam.
This will be achieved by:

  • Installing six temporary siphons to dewater and control the 270 acre reservoir

  • Installing a temporary cofferdam to work on the structure “in the dry”

  • Mechanical removal of all deleterious and damaged concrete and spall areas from the submerged face of the dam and spillways and repair or replacement of concrete in these areas

  • Installing a 225cy concrete cap

  • Filling the entire structure with shotcrete

  • Installing 51 high capacity post tension anchors tying the structure to the bedrock

  • Pressure grouting the entire structure to seal existing lift joints

  • Installing two-100cy buttress downstream of the structure

Once work is complete our team will perform removal of all construction staging, falsework, and cleaning of site.