Meadow Park Dam
Location: Crossville, TN
Owner: City of Crossville
General Contractor: Brayman Construction Corporation
Value: $4.3 Million
Date Complete: November 2011
Project includes structural remediation to provide stability and to eliminate leakage through and under dam.
This will be achieved by:
- Installing six temporary siphons to dewater and control the 270 acre reservoir
- Installing a temporary cofferdam to work on the structure “in the dry”
- Mechanical removal of all deleterious and damaged concrete and spall areas from the submerged face of the dam and spillways and repair or replacement of concrete in these areas
- Installing a 225cy concrete cap
- Filling the entire structure with shotcrete
- Installing 51 high capacity post tension anchors tying the structure to the bedrock
- Pressure grouting the entire structure to seal existing lift joints
- Installing two-100cy buttress downstream of the structure
Once work is complete our team will perform removal of all construction staging, falsework, and cleaning of site.