Structural remediation to provide stability and to eliminate leakage through and under dam.
This will be achieved by:
-
Installing six temporary siphons to dewater and control the 270 acre reservoir
-
Installing a temporary cofferdam to work on the structure “in the dry”
-
Mechanical removal of all deleterious and damaged concrete and spall areas from the submerged face of the dam and spillways and repair or replacement of concrete in these areas
-
Installing a 225cy concrete cap
-
Filling the entire structure with shotcrete
-
Installing 51 high capacity post tension anchors tying the structure to the bedrock
-
Pressure grouting the entire structure to seal existing lift joints
-
Installing two-100cy buttress downstream of the structure
Once work is complete our team will perform removal of all construction staging, falsework, and cleaning of site.