
Route 114 New River Bridge
Location: Radford, VA
Owner: Virginia Department of Transportation
General Contractor: Wright Brothers Construction Co., Inc.
Value: $1,906,910
Date Complete: Active
This project includes the installation of 16 drilled shafts, 84in diameter with 78in rock socket to depths ranging from 38 to 68ft. Prior to production, a load test will be performed on a trial shaft to verify the installation of 10 each, 36in diameter shafts ranging from 42 to 84lf in length.
