Brayman HISTORY

We Have An Excellent Reputation with Over 70 Years of Experience

Brayman Construction Corporation building

1947

The Beginning

Brayman Construction Corporation Building

Brayman Construction was founded with a staff of two.

1992

New Leadership

Brayman Construction is acquired and incorporated by Steve Muck and kept privately owned.

1996

Brayman Expands with Deep Foundations and Geotechnical Construction Solutions

Brayman expands with deep foundations and geotechnical construction solutions

2001

Brayman Expands with the Integration of Advantage Steel & Construction

2004

USACE Multi-Year Lock Replacement: Charleroi Lock & Dam, Charleroi, PA

USACE Charleroi Lock & Dam: Multi-year lock replacement project.

2005

PennDOT's First Design-Build Project: PA SR66 Apollo Bridge, Apollo, PA

PA SR66 Apollo Bridge

2006

First Application of Directional Drilling for this Type of Construction: Dam Safety Assurance (DSA) Phase 2B, Bluestone Dam, Hinton, WV

2007

Brayman's First Segmental Bridge Project: WVDOH I-64 Widening Project, Kanawha River Bridge, Charleston, WV

WVDOH I-64 Widening Project, Kanawha River Bridge

2008

Brayman Expands with the Integration of Specialty Underwater Services (SUS)

Brayman expands with marine construction and diving capabilities (SUS).

2010

Bluestone DSA Phase 3 Penstock Scour Protection: Bluestone Dam, Hinton, WV

Bluestone Dam, Dam Safety Assurance Phase 3

Completed an auxiliary stilling basin that included 70,000 cubic yards of excavation, 108,000 cubic yards of concrete, and 8M pounds of steel reinforcement for enhanced stormwater protection

Multi-Award Winning Cast-in-Place Cantilever Segmental Bridge: I-64 Kanawha River Bridge, Charleston, WV

I-64 Kanawha River Bridge

First of it's Type Innovative Dam Anchoring: Prettyboy Dam Rehabilitation, Baltimore, MD

Prettyboy Dam Rehabilitation

2011

Installed 724 Drilled Caissons: Dulles Corridor Metrorail Project, Fairfax County, VA

Dulles Corridor Metro Phase 1 Silver Line Milestone Project

Brayman Expands with the Integration of Brayman Precast

2012

Ironton-Russell Bridge: First Cable-Stay Bridge Project

Ironton-Russell Bridge

This award winning structure took approximately four and a half years to build and was opened on November 23, 2016, providing a main route for trucking and transportation in Ohio.

2013

PennDOT's First Strand Jacking Bridge Project: Jonathan Hulton Bridge, Oakmont, PA

Hulton Bridge

This award winning bridge was a major milestone for Brayman, with the steel erection being completed when the final 60-foot wide, 283-foot long, 1,200-ton section was strand jacked into position.

WV Design-Build Pilot Program: Rodney-Staton Bridge, Wyoming County, WV

Rodney-Staton Bridge

2016

Brayman Expands with the Integration of Robotics Partner Advanced Construction Robotics

Freedom Road

PennDOT's First Accelerated Bridge Construction (ABC) Project: SR 136 B&O Railroad Bridge, Eighty Four, PA

SR 136: PennDOT's first ABC Bridge Project.

This was the first use of a two-span continuous fabricated structural steel precast concrete deck module system in PA.

PA Turnpike Commission's First ABC Bridge Project: Beaver County, PA

PTC Slider: PA Turnpike's first ABC Bridge Project.

This project consisted of the lateral slide-in replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.

2017

WVDOH/WVPA First ABC Bridge Projects: BDR 1-17 and BDR 2-17, WV

BDR 1-17 and BDR 2-17: WVDOH/WVPA first ABC Bridge Projects.


2018

Brayman CEO Receives Engineering News Record (ENR) Top 25 Newsmaker Award

Stephen Muck, CEO of Brayman Construction Corporation and Co-founder & CEO of Advanced Construction Robotics receiving the ENR 2017 Top 25 Newsmaker Award at their April 5th ENR luncheon in NYC. This award was in recognition of his outstanding achievement in bringing TyBOT®, an autonomous rebar-tying robot, to the construction industry.

2019

First Brayman Led Joint Venture Project: US35/I-64 Nitro Design-Build Project, Putnam County, WV

Nitro: First Brayman led joint venture project.

Bluestone DSA Phase 5 Cofferdam: Bluestone Dam, Hinton, WV

Brayman completes temporary cofferdam with 36-foot cells, 230,000 pounds of steel, and extensive concrete and fill materials via floating plant operations

2020

Bluestone Dam Phase 5:

Final 9 year long phase of this USACE mega-project. It will capstone a 25 year long project for Brayman.

2022

Brayman's First International Project: Brayman-Shoreline JV, Kingston Wharves Limited Berth 7 Reconstruction at Port Bustamante, Kingston, Jamaica

Brayman-Shoreline Joint Venture. Reconstruction of Berth 7 at Port Bustamante, Kinston, Jamaica.

2023

Brayman Secures Furthest Foundation Division Project-to-Date: GRDA's Kerr Dam, Tulsa, OK

2024

Brayman Debuts its New Bauer BG45 Drill Rig: Big Walnut Combined Sewer Overflow (CSO)Tunnelling Project, Columbus, OH

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.