Retaining Walls / Sound Walls
Building high-quality retaining and sound walls for diverse applications.
![](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65e48fb4fef36c1f80cc2152_DF-D%26G---Retaining-Sound-Wall---Transform-I-66.webp)
Retaining Walls / Sound Walls
Multi-Phase Project: Phase
Cadiz Ohio Slope Repair
![Cadiz Ohio Slope Repair](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/66672b305480162df3f5b24c_IMG_4313.webp)
This Cadiz Ohio slope repair project was a crucial endeavor aimed at preventing further strain on an adjacent pipeline.
Multi-Phase Project: Phase
Walmart Retaining Wall - #5112.00 Phase IVA
![Walmart Retaining Wall - #5112.00 Phase IVA](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5ce19cebba152b55ed36e_Newsflash-Walmart-009.webp)
Brayman's scope of work required installation of an 800-foot, tieback-anchored soldier beam and lagging wall, comprised of 99-each soldier beams; 91-each, 7-strand and 8-strand Class I corrosion protected anchors; and 15,000-SF of mixed 4-inch thick hardwood lagging.
Multi-Phase Project: Phase
Alpha Coal - LaBelle Facility
![Alpha Coal - LaBelle Facility](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5c3fecebba152b559ced4_Alpha-Coal-Labelle-Facility-01-1-495x400.webp)
The project consisted of two phases. Phase 1 involved the installation of an anchored sheet pile retaining wall and the installation of eight 120-inch diameter caissons. Phase 2 included the installation of structural steel beams and the construction of a 120-foot by 46-foot concrete deck.
Multi-Phase Project: Phase
Shell Cracker Plant
![Shell Cracker Plant](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5bf564b8e99cd2d0eb9ae_Home-Shell-Cracker-Plant-Header-Image-495x400.webp)
Brayman’s scope of work included installation of soldier beams, and tiebacks anchors while working closely with other contractors on precast panel installation and backfilling activities.
Multi-Phase Project: Phase
Charleston Civic Center
![Charleston Civic Center](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5aecd145d5b167fb1084b_Charleston-Civic-Center-02.webp)
Brayman’s scope of work involved installation of a 335-feet long driven sheet pile retaining wall along the Elk River, as well as installation of a temporary 35-feet long sheet pile wall outside of the high water mark.
Multi-Phase Project: Phase
New River Parkway
![New River Parkway](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b592ce3061e1aff3d061f3_New-River-Parkway-04-1.webp)
The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Multi-Phase Project: Phase
PTC Sheet Pile MP 39.62 - 44.04
![PTC Sheet Pile MP 39.62 - 44.04](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b58a4abe58c763ed08ea78_PTC-Trumbull-Sheet-Pile-1-e1545405446246-773x1030.webp)
Brayman was subcontracted to provide specialty geotechnical construction services in support of a roadway and bridge reconstruction project located between milepost 39.62 and milepost 44.04 along the Pennsylvania Turnpike in Allegheny County, PA.
Multi-Phase Project: Phase
Shelby Dell Wall
![Shelby Dell Wall](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b58124dd8b6e13ed0fe379_shelby_dell3.webp)
Installation of an 80' deep tied back retaining wall.
Deep Foundation Drilling & Grouting
Complex Heavy Civil Infrastructure
Get in Touch
Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.
![](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65e491c74dabf19201363f69_Get-in-Touch---Retaining-%26-Sound-Walls--Transform-I66-Dual-beam-Install.webp)