Complex Heavy Civil Infrastructure
Accelerated Bridge Construction (ABC)
Specializing in accelerated bridge construction with precast concrete slab designs for rapid, efficient project completion.

Accelerated Bridge Construction (ABC)
Multi-Phase Project: Phase
Tom Williams Family Bridge +3 Design-Build

Brayman Construction was awarded a $20.5 million design-build Accelerated Bridge Construction (ABC) contract for a multi-bridge project consisting of 8 bridge deck replacements and 2 specialized overlays along the busy I-77 and I-64 corridor in Charleston, WV that had to be completed in an extremely short timeframe.
Multi-Phase Project: Phase
Fort Pitt Boulevard

The work included the reconstruction of overpass connections to Fort Pitt Boulevard, and construction of a new three-span bridge and ramps.
Multi-Phase Project: Phase
SR 30 over Bessemer Avenue

The Pennsylvania Department of Transportation’s replacement of the SR 30 Bridge near East Pittsburgh, PA, was comprised of the complete demolition of the existing superstructure, replacement of abutment stems, installation of precast deck modules, and setting of sleeper and approach slabs.
Multi-Phase Project: Phase
McKnight Road Rehab

The McKnight Road project involved bridge rehabilitation, including deck replacement, of four structures along a stretch of road infamously known locally for traffic congestion.
Multi-Phase Project: Phase
SR 136 B&O Railroad Bridge

The Pennsylvania Department of Transportation’s replacement of the SR 136 Bridge near Eighty Four, PA, was the first use of a two-span continuous fabricated structural steel precast concrete deck module system in Pennsylvania.
Multi-Phase Project: Phase
PTC Slide

The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.
Multi-Phase Project: Phase
New River Parkway

The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Multi-Phase Project: Phase
West Virginia Bridges 3019N & 3020N

This project consisted of replacing two concrete bridge decks with a contracted time of 225 hours.
Deep Foundation Drilling & Grouting
Complex Heavy Civil Infrastructure