Deep Foundation Drilling & Grouting
Cofferdams / River Mooring Cells
Facilitating aquatic construction with cofferdams and river mooring cells.

Cofferdams / River Mooring Cells
Multi-Phase Project: Phase
SR 351, Section B10 Koppel Bridge (Fifth Avenue)

Brayman Construction was contracted to replace the existing Koppel Bridge spanning the Beaver River between Koppel Borough and North Sewickley Township, PA.
Multi-Phase Project: Phase
VDOT D13 Rte 58 4 Lane Rhea Valley

Brayman was contracted by Kanawha Stone Company for assistance on a project for the reconstruction and upgrade of Route 58 in a very rural area of the Blue Ridge Mountains in Washington County, Virginia.
Multi-Phase Project: Phase
US 35/I-64 I/C Interchange – Nitro I/C Design-Build

Brayman Construction Corporation and Trumbull Corporation, a Joint Venture (BTJV), was contracted to provide design and construction services for the $254 million U.S. 35/I-64 Interchange – Nitro Interchange Design-Build Project. Brayman served as the lead contractor in this Joint Venture.
Multi-Phase Project: Phase
James Rumsey Bridge

Erected just upstream of the old bridge, the new 1096lf structure is a three-span steel haunch plate girder design carrying two lanes of traffic plus an eight-foot wide sidewalk.
Multi-Phase Project: Phase
AEP Cardinal Power Station

Brayman was contracted by the Black & Veatch Corporation to construct a new barge unloading and mooring facility as part of the necessary flue-gas desulfurization (FGD) upgrades at the existing Cardinal Power Station located in Brilliant, OH.
Multi-Phase Project: Phase
ALCOSAN Flow Control Project

Brayman was contracted to install precast concrete coffer boxes around the pipe to allow for easier access to the pipe for cleaning operations.
Multi-Phase Project: Phase
Masontown Bridge

The Masontown Bridge project involved the replacement of an existing 11-span, two lane steel truss structure with a new 1,700-LF 7-span four lane plate girder bridge.
Multi-Phase Project: Phase
Cochranton Truss

The new 338-feet long two-lane bridge was constructed with the substructure founded on cast-in-place concrete pipe piles.
Multi-Phase Project: Phase
Hulton Bridge

The Pennsylvania Department of Transportation’s Replacement of the Hulton Bridge near Oakmont, PA, involved the replacement of a two lane truss bridge with a new 1,633 LF four lane five span haunched girder bridge erected upstream of the existing bridge on the Allegheny River.
Multi-Phase Project: Phase
3
Bluestone Dam

Brayman was contracted to provide specialty construction services in support of the Dam Safety Assurance (DSA) Phase 3 Project at Bluestone Dam.
Multi-Phase Project: Phase
Ironton Russell Bridge

This award winning new bridge is a cable stay structure with 326’ tall delta shaped towers and a 900’ main span (the longest span ever constructed by ODOT).
Multi-Phase Project: Phase
VDOT L55

This project consists of four and one-half feet drilled Shafts at the abutments and six and one-half feet drilled shafts at the river piers.
Multi-Phase Project: Phase
5 Cofferdam
Bluestone Dam

A sheet pile cofferdam was installed down the center of the existing stilling basin to divide the spillway in half in preparation for the Phase 5 Spillway Reconstruction Project.
Deep Foundation Drilling & Grouting
Complex Heavy Civil Infrastructure