Deep Foundation Drilling & Grouting
Pre-Drilled / Driven Piling
Ensuring foundation strength with precise pre-drilled and driven piling.
![](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65e48fddac4e605ee4ee0bbd_DF-D%26G---Pre-Drilled-%26-Driven-Piling---Carleroi.webp)
Pre-Drilled / Driven Piling
Multi-Phase Project: Phase
Triboro Bridge
![Triboro Bridge](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5da2318c0ed90767e9272_Triboro-Bridge-02.webp)
The project involved the rehabilitation of an 11 span, curved girder bridge linking SR 2083 - Section A01, ramp S to SR 2037 - ramp T in Allegheny County, East Pittsburgh Borough.
Multi-Phase Project: Phase
Nesbitt Dam
![Nesbitt Dam](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5d23c0d279c9935725135_Nesbitt-Dam-04.webp)
This project exemplified Brayman's ability to offer "one stop shopping" for construction services by featuring several capabilities including high capacity dam anchors, temporary shoring, and driven piling.
Multi-Phase Project: Phase
SR 28 Widening
![SR 28 Widening](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5d156d7c156e764116077_SR-28-Widening-10-1523x728.webp)
Brayman was contracted by PennDOT to widen PA State Route 28, section A50, located near downtown Pittsburgh.
Multi-Phase Project: Phase
Hulton Bridge
![Hulton Bridge](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5b7f123169546f9ba0d33_Hulton-Bridge-01-1-495x400.webp)
The Pennsylvania Department of Transportation’s Replacement of the Hulton Bridge near Oakmont, PA, involved the replacement of a two lane truss bridge with a new 1,633 LF four lane five span haunched girder bridge erected upstream of the existing bridge on the Allegheny River.
Multi-Phase Project: Phase
SR 136 B&O Railroad Bridge
![SR 136 B&O Railroad Bridge](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5b3327db264a75d91a8f3_superstructure-erection-1-1523x728.webp)
The Pennsylvania Department of Transportation’s replacement of the SR 136 Bridge near Eighty Four, PA, was the first use of a two-span continuous fabricated structural steel precast concrete deck module system in Pennsylvania.
Multi-Phase Project: Phase
Ironton Russell Bridge
![Ironton Russell Bridge](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65b5addd1e9d621bd91df313_Ironton-Russell-Bridge-large-845x684.webp)
This award winning new bridge is a cable stay structure with 326’ tall delta shaped towers and a 900’ main span (the longest span ever constructed by ODOT).
Deep Foundation Drilling & Grouting
Complex Heavy Civil Infrastructure
Get in Touch
Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.
![](https://cdn.prod.website-files.com/65a99ffdc9b52924d1d8fffd/65e491e54df38555aeea59f5_Get-in-Touch---Pre-Drilled-%26-Driven-Piling---PTC-Trumbull-Sheet-Piles.webp)