Multi-Phase Project: Phase

PennDOT I-84 Bridge Caissons Lackawanna County

Brayman Construction Corporation was subcontracted to install caissons for a bridge replacement project on I-84 outside of Scranton, PA.
location
Scranton
,
Pennsylvania
ESTIMATED VALUE
$1.6 M
owner
PennDOT, District 4-0
Completion date
09/2026
general contractor
J.D. Eckman, Inc.
Market
Transportation
Multi-Phase Project: Phase

PennDOT I-84 Bridge Caissons Lackawanna County

Brayman Construction Corporation was subcontracted to install caissons for a bridge replacement project on I-84 outside of Scranton, PA. The scope of work included drilling 16-each, 48” diameter caissons at one location with 42” diameter rock sockets and an approximate total drill depth of 603 LF of soil and 208 LF of rock. At the second location, the Team drilled 9-each, 48” diameter caissons with 42” diameter rock sockets and an approximate total drill depth of 432 LF of soil and 459 LF of rock. Brayman also drilled 4-each, 48” diameter caissons with an approximate total drill depth of 72 LF of soil and 6-each, 54” diameter caissons with an approximate total drill depth of 126 LF of soil and 3 LF of rock to support sign structures. The shafts were constructed with permanent casing. Given the rocky conditions, boulders and cobbles posed challenges during the drilling process.

PennDOT I-84 Bridge Caissons Lackawanna County

Project Gallery

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.