Multi-Phase Project: Phase
PTC Slide
The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.
location
Beaver County
,
Pennsylvania
ESTIMATED VALUE
$5.5M
owner
PA Turnpike Commission
Completion date
11/2017
general contractor
Brayman Construction Corporation
Market
Transportation

Multi-Phase Project: Phase
PTC Slide
The PA Turnpike Commission’s Superstructure Replacement of WB-224B was the first lateral slide-in bridge construction project for both Brayman and the PA Turnpike Commission. The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge. Building of the new superstructure was done off-line alignment on temporary supports, then it was slid into position during a 53-hour closure, two hours ahead of schedule.
OUR PROJECTS
Related Projects
Multi-Phase Project
Chickamauga Lock Monolith M48 Anchors

Project consists of 60,000 CY of rock excavation, 65,000 CY common excavation, over 100,000 CY embankment material, 90,000 CY of mass concrete and over 1,150 high capacity dam anchors. It will also include a grout curtain and reconstruction of the left and right river banks.
Multi-Phase Project: Phase
VDOT D13 Rte 58 4 Lane Rhea Valley

Brayman was contracted by Kanawha Stone Company for assistance on a project for the reconstruction and upgrade of Route 58 in a very rural area of the Blue Ridge Mountains in Washington County, Virginia.
Multi-Phase Project: Phase
I-77 over Route 606 Bridge Replacement Design-Build

Brayman Construction Corporation (BCC) was contracted by the Virginia Department of Transportation (VDOT) to provide design, Quality Control/Quality Assurance Management (QC/QAM), and construction services for the I-77 Over Route 606 Bridge Replacement project in Bland County, VA.
Multi-Phase Project: Phase
Tom Williams Family Bridge +3 Design-Build

Brayman Construction was awarded a $20.5 million design-build Accelerated Bridge Construction (ABC) contract for a multi-bridge project consisting of eight bridge deck replacements and two specialized overlays along the busy I-77 and I-64 corridor in Charleston, WV that had to be completed on an accelerated timeline.
Multi-Phase Project: Phase
US 35/I-64 I/C Interchange – Nitro I/C Design-Build

Brayman Construction Corporation and Trumbull Corporation, a Joint Venture (BTJV), was contracted to provide design and construction services for the $254 million U.S. 35/I-64 Interchange – Nitro Interchange Design-Build Project. Brayman served as the lead contractor in this Joint Venture.
Multi-Phase Project: Phase
Fort Pitt Boulevard

The work included the reconstruction of overpass connections to Fort Pitt Boulevard, and construction of a new three-span bridge and ramps.
Multi-Phase Project: Phase
Norfolk Southern Partial Bridge Removal

This project consisted of shoring an existing active rail that was to remain after bridge removal.
Multi-Phase Project: Phase
Triboro Bridge

The project involved the rehabilitation of an 11 span, curved girder bridge linking SR 2083 - Section A01, ramp S to SR 2037 - ramp T in Allegheny County, East Pittsburgh Borough.
Multi-Phase Project: Phase
North Shore Connector Aerial Structure

Completion of this project further extends Allegheny County’s Light Rail System from underneath downtown Pittsburgh and the Allegheny River to the North Shore.
Multi-Phase Project: Phase
SR 28 Widening

Brayman was contracted by PennDOT to widen PA State Route 28, section A50, located near downtown Pittsburgh.
Multi-Phase Project: Phase
Rodney Staton Memorial Bridge

The Rodney Staton Memorial Bridge project involved the design-build rehabilitation of a 630-LF, three span structure spanning R.D. Bailey Lake.
Multi-Phase Project: Phase
Greensburg Pike Bridge

Brayman was contracted to replace the existing seven-span steel truss Greensburg Pike Bridge carrying SR 7467 over Turtle Creek and three active Norfolk Southern rail tracks located in Allegheny County, PA.
Multi-Phase Project: Phase
Lilly Bridge

The Lilly Bridge project involved replacement of a cantilever truss bridge with a new 1,220-LF five-span, fabricated steel girder bridge.
Multi-Phase Project: Phase
Hulton Bridge

The Pennsylvania Department of Transportation’s Replacement of the Hulton Bridge near Oakmont, PA, involved the replacement of a two lane truss bridge with a new 1,633 LF four lane five span haunched girder bridge erected upstream of the existing bridge on the Allegheny River.
Multi-Phase Project: Phase
SR 30 over Bessemer Avenue

The Pennsylvania Department of Transportation’s replacement of the SR 30 Bridge near East Pittsburgh, PA, was comprised of the complete demolition of the existing superstructure, replacement of abutment stems, installation of precast deck modules, and setting of sleeper and approach slabs.
Multi-Phase Project: Phase
McKnight Road Rehab

The McKnight Road project involved bridge rehabilitation, including deck replacement, of four structures along a stretch of road infamously known locally for traffic congestion.
Multi-Phase Project: Phase
SR 136 B&O Railroad Bridge

The Pennsylvania Department of Transportation’s replacement of the SR 136 Bridge near Eighty Four, PA, was the first use of a two-span continuous fabricated structural steel precast concrete deck module system in Pennsylvania.
Multi-Phase Project: Phase
7th Street Bridge Rehab

Brayman Construction was contracted to perform the $25.4 million rehabilitation of the 7th Street “Andy Warhol” Bridge for the Allegheny Department of Public Works.
Multi-Phase Project: Phase
PTC Slide

The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.
Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles

Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.
Multi-Phase Project: Phase
New River Parkway

The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Multi-Phase Project: Phase
West Virginia Bridges 3019N & 3020N

This project consisted of replacing two concrete bridge decks with a contracted time of 225 hours.