Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles
Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.
location
Macungie
,
Pennsylvania
ESTIMATED VALUE
$1M
owner
Norfolk Southern Corporation
Completion date
12/2017
general contractor
Trumbull Energy Services
Market
Transportation

Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles
Nine 5/8th inch micropiles were installed 90 feet deep in only nine feet of headroom. The piles were installed under an active high-speed rail line with no interruption to rail service. The work area was in a coffer at the bottom of a stream bed.
OUR PROJECTS
Related Projects
Multi-Phase Project
Chickamauga Lock Monolith M48 Anchors

Project consists of 60,000 CY of rock excavation, 65,000 CY common excavation, over 100,000 CY embankment material, 90,000 CY of mass concrete and over 1,150 high capacity dam anchors. It will also include a grout curtain and reconstruction of the left and right river banks.
Multi-Phase Project: Phase
I-77 over Route 606 Bridge Replacement Design-Build

Brayman Construction Corporation (BCC) was contracted by the Virginia Department of Transportation (VDOT) to provide design, Quality Control/Quality Assurance Management (QC/QAM), and construction services for the I-77 Over Route 606 Bridge Replacement project in Bland County, VA.
Multi-Phase Project: Phase
Tom Williams Family Bridge +3 Design-Build

Brayman Construction was awarded a $20.5 million design-build Accelerated Bridge Construction (ABC) contract for a multi-bridge project consisting of 8 bridge deck replacements and 2 specialized overlays along the busy I-77 and I-64 corridor in Charleston, WV that had to be completed in an extremely short timeframe.
Multi-Phase Project: Phase
US 35/I-64 I/C Interchange – Nitro I/C Design-Build

Brayman Construction Corporation and Trumbull Corporation, a Joint Venture (BTJV), was contracted to provide design and construction services for the $254 million U.S. 35/I-64 Interchange – Nitro Interchange Design-Build Project. Brayman served as the lead contractor in this Joint Venture.
Multi-Phase Project: Phase
Smithburg Micropiles

The Brayman Construction Foundations Division was subcontracted by Markwest Midstream to execute the installation of micropile foundations for a new Cryogenic plant in Smithburg, WV.
Multi-Phase Project: Phase
5051 Center Avenue

The Brayman Construction Foundations Division was subcontracted by Turner Construction for micropile foundations at the historic Ford Factory in the East Liberty neighborhood of Pittsburgh, PA.
Multi-Phase Project: Phase
Elmhurst Innovation Center

Brayman Construction Corporation (Brayman) was subcontracted to provide specialty geotechnical construction services in support of the Elmhurst Innovation Center project located in Pittsburgh, PA.
Multi-Phase Project: Phase
PTC Mon-Fayette Expressway

The Mon/Fayette Expressway, a critical infrastructure project with planning origins tracing back to the 1950s, continues its development toward completion. The Brayman Construction Foundations Division, was subcontracted by Trumbull Corp to execute the installation of micropile foundations for the latest section of this expansive expressway, Section 53A1.
Multi-Phase Project: Phase
Heartland Homes, HiddenBrook Development

Brayman was contracted to provide specialty geotechnical services to Heartland Homes, Inc. for this residential land development project located 15 miles south of Pittsburgh at the Hiddenbrook Development Plan in Peters Township, PA.
Multi-Phase Project: Phase
Harpers Ferry Design & Learning Center

Brayman Foundations Division was subcontracted to provide a Design-Build micropile foundation solution for the new U.S. Customs and Border Protection (USCBP) Integrated Design and Construction/Design Learning Center (IDC/DLC) Facility in Harpers Ferry, WV.
Multi-Phase Project: Phase
Fort Pitt Boulevard

The work included the reconstruction of overpass connections to Fort Pitt Boulevard, and construction of a new three-span bridge and ramps.
Multi-Phase Project: Phase
James Rumsey Bridge

Erected just upstream of the old bridge, the new 1096lf structure is a three-span steel haunch plate girder design carrying two lanes of traffic plus an eight-foot wide sidewalk.
Multi-Phase Project: Phase
Sammis Power Plant

Work involved the installation of deep foundation systems requiring in excess of 5,000 driven H-piles (over 75 miles) and nearly 300 micropiles.
Multi-Phase Project: Phase
Essroc Facility Expansion

At the time one of the largest micropile projects completed in the US. Over 1600 micropiles and Low Mobility Grouting installed in karst Limestone as part of a 320 million dollar plant upgrade.
Multi-Phase Project: Phase
Norfolk Southern Partial Bridge Removal

This project consisted of shoring an existing active rail that was to remain after bridge removal.
Multi-Phase Project: Phase
North Shore Connector Aerial Structure

Completion of this project further extends Allegheny County’s Light Rail System from underneath downtown Pittsburgh and the Allegheny River to the North Shore.
Multi-Phase Project: Phase
SR 28 Widening

Brayman was contracted by PennDOT to widen PA State Route 28, section A50, located near downtown Pittsburgh.
Multi-Phase Project: Phase
Casselman River Bridge

When a portion of the northwest wingwall collapsed, the Maryland DNR and DGS contracted with Brayman for an emergency stabilization. The remediation included salvaging the original facing stones, removing the existing bridge deck, and excavating 9 feet below deck elevation.
Multi-Phase Project: Phase
Rodney Staton Memorial Bridge

The Rodney Staton Memorial Bridge project involved the design-build rehabilitation of a 630-LF, three span structure spanning R.D. Bailey Lake.
Multi-Phase Project: Phase
Culmerville Truss

The new 130-feet long two-lane bridge consisted of a single-span steel beam five-girder structure with new abutments supported by drilled caissons and rock anchors.
Multi-Phase Project: Phase
7th Street Bridge Rehab

Brayman Construction was contracted to perform the $25.4 million rehabilitation of the 7th Street “Andy Warhol” Bridge for the Allegheny Department of Public Works.
Multi-Phase Project: Phase
PTC Slide

The project consisted of the replacement of the existing two-span adjacent box beam superstructure, with a two-span continuous composite steel plate girder bridge.
Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles

Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.
Multi-Phase Project: Phase
MarkWest Harmon Creek

Brayman was contracted by a midstream operator to complete the micropile installation at their new gas processing Cryogenic and De-Ethanizer facility located in Washington County, PA.
Multi-Phase Project: Phase
MarkWest Majorsville

The project required the installation of 578 micropiles with diameters of five and one-half-inch, seven-inch, and nine and five-eights-inch, and depths ranging from 30 feet to over 100 feet.
Multi-Phase Project: Phase
New River Parkway

The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Multi-Phase Project: Phase
Ripken Stadium Structural Repair

Installation of 21 micropiles through the existing footer and 24 tiebacks through the existing wall. The micropiles and tiebacks will be tied together with a new retaining wall poured in front of the existing retaining wall.