Multi-Phase Project: Phase
Culmerville Truss
The new 130-feet long two-lane bridge consisted of a single-span steel beam five-girder structure with new abutments supported by drilled caissons and rock anchors.
location
Allegheny County
,
Pennsylvania
ESTIMATED VALUE
$5M
owner
PennDOT, District 11
Completion date
10/2016
general contractor
Brayman Construction Corporation
Market
Transportation

Multi-Phase Project: Phase
Culmerville Truss
Brayman was contracted by PennDOT District 11-0 for replacement of the Culmerville Truss Bridge spanning the Canadian National Railway located in Allegheny County, PA. The new 130-feet long two-lane bridge consisted of a single-span steel beam five-girder structure with new abutments supported by drilled caissons and rock anchors. The steep hillsides and limited access at the ends of the bridge provided many challenges during construction.
OUR PROJECTS
Related Projects
Multi-Phase Project
Chickamauga Lock Monolith M48 Anchors

Project consists of 60,000 CY of rock excavation, 65,000 CY common excavation, over 100,000 CY embankment material, 90,000 CY of mass concrete and over 1,150 high capacity dam anchors. It will also include a grout curtain and reconstruction of the left and right river banks.
Multi-Phase Project: Phase
1 & 2
Dover Dam

Post tension anchors, spillway access platforms, underwater anchors, increased dam height via post tensioned pre-cast panels, 2 mile access road, shoring, caissons, soil nail wall, this job had it all.
Multi-Phase Project: Phase
2A
Iron Mountain Boyers

Brayman’s scope of work included installation of 11-each large diameter shafts, up to 240-feet deep and 42-inch diameter, which will be used for various utilities.
Multi-Phase Project: Phase
3
Bluestone Dam

Brayman was contracted to provide specialty construction services in support of the Dam Safety Assurance (DSA) Phase 3 Project at Bluestone Dam.
Multi-Phase Project: Phase
5 Cofferdam
Bluestone Dam

A sheet pile cofferdam was installed down the center of the existing stilling basin to divide the spillway in half in preparation for the Phase 5 Spillway Reconstruction Project.
Multi-Phase Project: Phase
5
Bluestone Dam

Project consists of 60,000 CY of rock excavation, 65,000 CY common excavation, over 100,000 CY embankment material, 90,000 CY of mass concrete and over 1,150 high capacity dam anchors. It will also include a grout curtain and reconstruction of the left and right river banks.
Multi-Phase Project: Phase
US 35/I-64 I/C Interchange – Nitro I/C Design-Build

Brayman Construction Corporation and Trumbull Corporation, a Joint Venture (BTJV), was contracted to provide design and construction services for the $254 million U.S. 35/I-64 Interchange – Nitro Interchange Design-Build Project. Brayman served as the lead contractor in this Joint Venture.
Multi-Phase Project: Phase
Cadiz Ohio Slope Repair

This Cadiz Ohio slope repair project was a crucial endeavor aimed at preventing further strain on an adjacent pipeline.
Multi-Phase Project: Phase
Smithburg Micropiles

The Brayman Construction Foundations Division was subcontracted by Markwest Midstream to execute the installation of micropile foundations for a new Cryogenic plant in Smithburg, WV.
Multi-Phase Project: Phase
5051 Center Avenue

The Brayman Construction Foundations Division was subcontracted by Turner Construction for micropile foundations at the historic Ford Factory in the East Liberty neighborhood of Pittsburgh, PA.
Multi-Phase Project: Phase
Wheeling Suspension Bridge

Brayman Construction Corp. (BCC) was subcontracted by Advantage Steel and Construction, LLC to perform a repair procedure involving a new anchorage system to attach the suspension cable at one corner of the Wheeling Suspension Bridge.
Multi-Phase Project: Phase
Elmhurst Innovation Center

Brayman Construction Corporation (Brayman) was subcontracted to provide specialty geotechnical construction services in support of the Elmhurst Innovation Center project located in Pittsburgh, PA.
Multi-Phase Project: Phase
PTC Mon-Fayette Expressway

The Mon/Fayette Expressway, a critical infrastructure project with planning origins tracing back to the 1950s, continues its development toward completion. The Brayman Construction Foundations Division, was subcontracted by Trumbull Corp to execute the installation of micropile foundations for the latest section of this expansive expressway, Section 53A1.
Multi-Phase Project: Phase
Heartland Homes, HiddenBrook Development

Brayman was contracted to provide specialty geotechnical services to Heartland Homes, Inc. for this residential land development project located 15 miles south of Pittsburgh at the Hiddenbrook Development Plan in Peters Township, PA.
Multi-Phase Project: Phase
Harpers Ferry Design & Learning Center

Brayman Foundations Division was subcontracted to provide a Design-Build micropile foundation solution for the new U.S. Customs and Border Protection (USCBP) Integrated Design and Construction/Design Learning Center (IDC/DLC) Facility in Harpers Ferry, WV.
Multi-Phase Project: Phase
Fort Pitt Boulevard

The work included the reconstruction of overpass connections to Fort Pitt Boulevard, and construction of a new three-span bridge and ramps.
Multi-Phase Project: Phase
James Rumsey Bridge

Erected just upstream of the old bridge, the new 1096lf structure is a three-span steel haunch plate girder design carrying two lanes of traffic plus an eight-foot wide sidewalk.
Multi-Phase Project: Phase
Sammis Power Plant

Work involved the installation of deep foundation systems requiring in excess of 5,000 driven H-piles (over 75 miles) and nearly 300 micropiles.
Multi-Phase Project: Phase
Essroc Facility Expansion

At the time one of the largest micropile projects completed in the US. Over 1600 micropiles and Low Mobility Grouting installed in karst Limestone as part of a 320 million dollar plant upgrade.
Multi-Phase Project: Phase
Westinghouse Electric Global Headquarters

Brayman was subcontracted to provide foundation support for the construction of the new three-building Westinghouse Global Headquarters and Education Campus located on an 83 acre parcel in Cranberry Township, PA.
Multi-Phase Project: Phase
Triboro Bridge

The project involved the rehabilitation of an 11 span, curved girder bridge linking SR 2083 - Section A01, ramp S to SR 2037 - ramp T in Allegheny County, East Pittsburgh Borough.
Multi-Phase Project: Phase
Freeport Bridge

Brayman Construction Corporation was contracted by PENNDOT to repair and strengthen the existing Freeport Bridge over the Allegheny River north of Pittsburgh, PA.
Multi-Phase Project: Phase
North Shore Connector Aerial Structure

Completion of this project further extends Allegheny County’s Light Rail System from underneath downtown Pittsburgh and the Allegheny River to the North Shore.
Multi-Phase Project: Phase
PTC Mine Grout

As part of the third lane expansion of the Pennsylvania Turnpike from MP 67.59-MP 74.59, Brayman performed 30,000-ft of drilling and onsite batching of 16,000-cy of grout to stabilize an abandoned coal mine adjacent to the roadway.
Multi-Phase Project: Phase
Kanawha River Bridge

Brayman was contracted by the WV Division of Highways to construct a new 2,975’ long concrete segmental bridge outside of Charleston, WV to carry eastbound I-64 over the Kanawha River.
Multi-Phase Project: Phase
Dulles Corridor Metrorail Extension

Brayman’s scope of work required installation of deep foundation systems for the elevated guideways and stations.
Multi-Phase Project: Phase
Charleroi Locks & Dam - New River Wall

The new River Wall project is a component of a larger effort to improve and modernize the navigation facilities on the Lower Monongahela River between Braddock and Charleroi.
Multi-Phase Project: Phase
SR 28 Widening

Brayman was contracted by PennDOT to widen PA State Route 28, section A50, located near downtown Pittsburgh.
Multi-Phase Project: Phase
Strank Memorial Bridge

The Pennsylvania Department of Transportation awarded Brayman to rehabilitate the existing Strank Bridge located in Johnstown, PA.
Multi-Phase Project: Phase
Ices Ferry Bridge

The Ices Ferry Bridge project involved the replacement of a steel through-truss bridge with a new 960-LF four-span steel girder bridge located near Morgantown, WV.
Multi-Phase Project: Phase
Casselman River Bridge

When a portion of the northwest wingwall collapsed, the Maryland DNR and DGS contracted with Brayman for an emergency stabilization. The remediation included salvaging the original facing stones, removing the existing bridge deck, and excavating 9 feet below deck elevation.
Multi-Phase Project: Phase
Walmart Retaining Wall - #5112.00 Phase IVA

Brayman's scope of work required installation of an 800-foot, tieback-anchored soldier beam and lagging wall, comprised of 99-each soldier beams; 91-each, 7-strand and 8-strand Class I corrosion protected anchors; and 15,000-SF of mixed 4-inch thick hardwood lagging.
Multi-Phase Project: Phase
ALCOSAN Flow Control Project

Brayman was contracted to install precast concrete coffer boxes around the pipe to allow for easier access to the pipe for cleaning operations.
Multi-Phase Project: Phase
CSX Youngstown

This project consisted of a new four-span steel structure bridge for CSX Railroad, located in Youngstown, Ohio.
Multi-Phase Project: Phase
Greensburg Pike Bridge

Brayman was contracted to replace the existing seven-span steel truss Greensburg Pike Bridge carrying SR 7467 over Turtle Creek and three active Norfolk Southern rail tracks located in Allegheny County, PA.
Multi-Phase Project: Phase
Hawks Nest Dam

Brayman was selected to install 50 epoxy coated dam anchors, which upgraded the structure to current federal dam safety standards.
Multi-Phase Project: Phase
Alpha Coal - LaBelle Facility

The project consisted of two phases. Phase 1 involved the installation of an anchored sheet pile retaining wall and the installation of eight 120-inch diameter caissons. Phase 2 included the installation of structural steel beams and the construction of a 120-foot by 46-foot concrete deck.
Multi-Phase Project: Phase
Masontown Bridge

The Masontown Bridge project involved the replacement of an existing 11-span, two lane steel truss structure with a new 1,700-LF 7-span four lane plate girder bridge.
Multi-Phase Project: Phase
Charleroi Locks & Dam Emptying Basin

The project scope involves building seven, separate precast concrete structures offsite, then loading the segments onto barges, delivering them to the job site, and assembling them into place, under water, using floating A-frame cranes.
Multi-Phase Project: Phase
Shell Cracker Plant

Brayman’s scope of work included installation of soldier beams, and tiebacks anchors while working closely with other contractors on precast panel installation and backfilling activities.
Multi-Phase Project: Phase
PTC Allegheny County Shotcrete

Work consisted of 2 temporary "fill walls", needed to support the existing roadway in fill areas until new MSE walls could be constructed and 2 permanent "cut walls", needed in areas where the new third lane construction required cutting existing embankments.
Multi-Phase Project: Phase
Lilly Bridge

The Lilly Bridge project involved replacement of a cantilever truss bridge with a new 1,220-LF five-span, fabricated steel girder bridge.
Multi-Phase Project: Phase
Hulton Bridge

The Pennsylvania Department of Transportation’s Replacement of the Hulton Bridge near Oakmont, PA, involved the replacement of a two lane truss bridge with a new 1,633 LF four lane five span haunched girder bridge erected upstream of the existing bridge on the Allegheny River.
Multi-Phase Project: Phase
DC Clean Rivers Div. 1 - Main Pumping Station

Brayman’s scope of work required installation of a secant pile excavation support system comprised of 152-each, 48-inch diameter interconnecting secant piles (12,309-LF) with depths up to 91-feet, as well as installation of 150-each, 18-inch diameter augercast piles for structure foundation support.
Multi-Phase Project: Phase
SR 136 B&O Railroad Bridge

The Pennsylvania Department of Transportation’s replacement of the SR 136 Bridge near Eighty Four, PA, was the first use of a two-span continuous fabricated structural steel precast concrete deck module system in Pennsylvania.
Multi-Phase Project: Phase
414 Light Street

Brayman was subcontracted to provide specialty geotechnical construction services in support of the 414 Light Street Apartment Complex project located at the corner of Light and Conway Streets on the edge of the Inner Harbor seaport of Baltimore, MD.
Multi-Phase Project: Phase
Culmerville Truss

The new 130-feet long two-lane bridge consisted of a single-span steel beam five-girder structure with new abutments supported by drilled caissons and rock anchors.
Multi-Phase Project: Phase
MarkWest Liberty Bluestone

Brayman was contracted by Songer Steel Services, Inc. to complete the concrete foundations for a new gas processing De-Ethanizer facility being constructed by a midstream operator located in Butler County, PA.
Multi-Phase Project: Phase
Ironton Russell Bridge

This award winning new bridge is a cable stay structure with 326’ tall delta shaped towers and a 900’ main span (the longest span ever constructed by ODOT).
Multi-Phase Project: Phase
Greensboro Western Loop

Brayman's scope of work required the installation of 318-each caissons comprising 239-each, 60-inch diameter; 58-each, 54-inch diameter; 18-each, 48-inch diameter; and 3-each, 42-inch diameter shafts.
Multi-Phase Project: Phase
Norfolk Southern Lehigh Micropiles

Nine 5/8th inch micropiles were installed under an active high-speed rail line with no interruption to rail service.
Multi-Phase Project: Phase
MarkWest Harmon Creek

Brayman was contracted by a midstream operator to complete the micropile installation at their new gas processing Cryogenic and De-Ethanizer facility located in Washington County, PA.
Multi-Phase Project: Phase
MarkWest Majorsville

The project required the installation of 578 micropiles with diameters of five and one-half-inch, seven-inch, and nine and five-eights-inch, and depths ranging from 30 feet to over 100 feet.
Multi-Phase Project: Phase
Charleroi Locks & Dam - River Chamber Completion

The modernization effort at this site will ultimately result in the construction of two new 84-feet wide by 720-feet long chambers to replace the existing 56-feet wide lock currently in operation.
Multi-Phase Project: Phase
Siemens Penn Hall

The project comprised the installation of 86 caissons with diameters ranging from 30" to 54".
Multi-Phase Project: Phase
Freedom Road Bridges

Brayman has completed two of the three bridges in 2017 including Romigh Road Bridge which is a two lane 80-feet long span, and Snake Run Bridge which is a three lane 123-feet span. Brayman is set to complete the third and final Park Quarry bridge in summer of 2018.
Multi-Phase Project: Phase
New River Parkway

The New River Parkway is a Heavy Civil Project encompassing the construction of just over five miles of new roadway, while maintaining traffic along the New River in Hinton, WV.
Multi-Phase Project: Phase
Lake Scranton Dam

Twenty-three post tensioned dam anchors were installed to upgrade capacity of the dam while working around multiple other sub-contractors in very tight access.
Multi-Phase Project: Phase
MarkWest Houston

Brayman’s work consisted of the installation of four drilled sump foundations and as well as 250 concrete spread footers, pedestal supports, wall piers, building foundations, and containment slabs to support the various equipment for the gas processing facility.
Multi-Phase Project: Phase
VDOT L55

This project consists of four and one-half feet drilled Shafts at the abutments and six and one-half feet drilled shafts at the river piers.
Multi-Phase Project: Phase
Prettyboy Dam

The Prettyboy Dam project involved the installation of an underwater anchorage system necessary to secure the concrete gatehouse to the dam.
Multi-Phase Project: Phase
PTC Sheet Pile MP 39.62 - 44.04

Brayman was subcontracted to provide specialty geotechnical construction services in support of a roadway and bridge reconstruction project located between milepost 39.62 and milepost 44.04 along the Pennsylvania Turnpike in Allegheny County, PA.
Multi-Phase Project: Phase
North Fork Spillway Soil Nail Wall

Brayman was subcontracted to install a 5719 SF soil nail wall as part of a spillway expansion project at the North Fork Dam near Black Mountain, NC. Both soil nails and tieback anchors were installed on this wall which served as a slope stabilization measure for construction of a permanent access road on the site.
Multi-Phase Project: Phase
Ripken Stadium Structural Repair

Installation of 21 micropiles through the existing footer and 24 tiebacks through the existing wall. The micropiles and tiebacks will be tied together with a new retaining wall poured in front of the existing retaining wall.
Multi-Phase Project: Phase
Penn Tunnel Fire Protection / 7th Ave Waterline