Rocky Forge Wind Farm Bridge

Rocky Forge Wind Farm Bridge
Brayman Construction Corporation was responsible for constructing two bridges near the Rocky Forge Wind Farm. The scope of work included replacing the superstructure of the Dagger Springs Road Bridge and constructing a new bridge, the Turbine Access Road Bridge.
The Dagger Springs Road Bridge was replaced to accommodate the heavy trucks that need access to the wind farm site, and the Turbine Access Road Bridge is required for access to the wind turbine locations. Brayman affiliate Advantage Steel & Construction fabricated the steel superstructure for the Dagger Springs Bridge.
Challenges include condensed, strict schedules to accommodate the wind farm’s construction needs. To meet the date, the Project Team worked closely with the GC, the engineer, and the owner to redesign the bridge abutments. The new design changed the micropile foundation to a driven H-pile foundation and redesigned the MSE walls supporting the abutment fills. This change allowed the H-piles to be installed while the MSE wall panels were being fabricated, saving weeks on the schedule.
Related Projects




































Get in Touch
Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.