Rocky Forge Wind Farm Bridge

Brayman Construction Corporation was responsible for constructing two bridges near the Rocky Forge Wind Farm.
location
Botetourt County
,
Virginia
ESTIMATED VALUE
$2.3M
owner
Rocky Forge Wind LLC
Completion date
04/2026
general contractor
Faulconer Construction Company, Inc.
Market
Transportation
Multi-Phase Project: Phase

Rocky Forge Wind Farm Bridge

Brayman Construction Corporation was responsible for constructing two bridges near the Rocky Forge Wind Farm. The scope of work included replacing the superstructure of the Dagger Springs Road Bridge and constructing a new bridge, the Turbine Access Road Bridge.

The Dagger Springs Road Bridge was replaced to accommodate the heavy trucks that need access to the wind farm site, and the Turbine Access Road Bridge is required for access to the wind turbine locations. Brayman affiliate Advantage Steel & Construction fabricated the steel superstructure for the Dagger Springs Bridge.

Challenges include condensed, strict schedules to accommodate the wind farm’s construction needs. To meet the date, the Project Team worked closely with the GC, the engineer, and the owner to redesign the bridge abutments. The new design changed the micropile foundation to a driven H-pile foundation and redesigned the MSE walls supporting the abutment fills. This change allowed the H-piles to be installed while the MSE wall panels were being fabricated, saving weeks on the schedule.

‍

‍