Multi-Phase Project: Phase

AEP Cardinal Power Station

Brayman was contracted by the Black & Veatch Corporation to construct a new barge unloading and mooring facility as part of the necessary flue-gas desulfurization (FGD) upgrades at the existing Cardinal Power Station located in Brilliant, OH.
location
Brilliant
,
Ohio
ESTIMATED VALUE
$6M
owner
American Electric Power (AEP)
Completion date
03/2007
general contractor
Black & Veatch Corporation
Market
Power
Multi-Phase Project: Phase

AEP Cardinal Power Station

Brayman was contracted by the Black & Veatch Corporation to construct a new barge unloading and mooring facility as part of the necessary flue-gas desulfurization (FGD) upgrades at the existing Cardinal Power Station located in Brilliant, OH.  In all, Brayman constructed seventeen new river cells, consisting of: twelve 20-foot diameter, two 30-foot diameter, and three 40-foot diameter sheet pile cells.

AEP Cardinal Power Station

Project Gallery

Get in Touch

Interested in Partnering or Joining Our Team? Connect with us to explore opportunities for collaboration and career growth at Brayman Construction.